After finishing our second sprint I believe it went very well. Our team did a great job of communicating, time management and ensuring everyone’s ideas were heard. We also made sure to ask each other questions if we were stuck on an issue as well as ask anyone if they needed any help with their issue if they were having any problems. I believe the only problem we had was reviewing the issues, we either got a little sidetracked or were waiting on a response to a question we had about the issue so it kind of prevented the reviewer from checking on it. As a group of 5, we needed a weight total of 30, we managed to complete all of our issues. Since the last sprint, I believe we made a lot of progress as a team and managed to get through this sprint without a lot of issues.
As a team, I believe we made a lot of progress in this sprint and didn’t have a lot of issues to work on. We made sure to communicate with each other about how everyone’s progress was going on with their issue and if they needed any help with anything. The reason why we managed to get through this sprint is because of our communication and teamwork. As a team an improvement that we can make is our reviewing, we did have a couple of issues left in the needs review column that just needed to be checked but we kind of delayed that. I believe that was our only problem this sprint since for most of the issues we worked as a group and managed to get it done in one meeting. If we just made sure to stay on top of any work that needs review I feel like our sprint would’ve been done sooner than later.
As an Individual I believe I made a lot of improvements since the last sprint. I made sure that the work was even spread out between me and the team. The issues I worked on were Get the InventorySystem General test and build working and Verifying GuestInfosystem/Documentation. I made sure that the guestinfo system documentation had the right extensions, linters and that the pipelines were working. The only problem I ended up having was with the inventory system general test and build working. I just ended up asking Professor Wurst what I should do with them since by looking at other repos the general didn’t have a test or build so I just ended up disabling those pipelines and everything ran smoothly. Next sprint I plan on working on my issues and making sure that nothing sits in needs review so my team members don’t have to do more work than they need to and make sure that I’m contributing as well. I also plan on making sure to get any questions I have asked as soon as possible so that the issue can be solved sooner rather than later.
From the blog CS@Worcester – Kaylene Noel's Blog by Kaylene Noel and used with permission of the author. All other rights reserved by the author.