Sprint Review Blog # 2

            Our second sprint had little coding action and more of a personal learning aspect that we decided to focus on. I found that the team benefited from individual learning in a similar fashion to an independent study when trying to learn about important concepts like Mockito testing and Angular formats. We then compiled our individual learning resources into our slack channel to help each other find resources that others may have missed. This allowed an easier flow of understanding while also being able to bring us all onto the same mindset of where we were in terms of starting the project. I will proceed to understand the AMPATH format for their angular code and translate that knowledge to the requirement we will need to meet in the future. AMPATH members have recently posted videos and presentations of how they want their new interface to look with explanations for user interactivity. We want to continue to understand how we should edit and evolve the code already given to us and turn it into the final product that they want. We will have to communicate not only with our team member but the other teams as well to go over which functions should be divided up and worked on. This will create a better organization system for how we should communicate with other teams as well to understand any implementations that they will do which might affect our portion of the project. We learned about how the AMPATH project works through the videos which explained everything from selection tabs to navigation elements. It seems that this design concept may be similar to that of a mobile app from the setup of the mockup files which makes our approach much easier to narrow down. The most important aspect of this design seems to be simplicity with functionality for the patients and their doctors. The ability to create a smooth design is going to be complicated with different teams working on separate functions that are supposed to come together to create this app. It will require concise and mutual communications from several fronts that we will need to perfect over time. I predict that in the beginning it will be difficult to explain our coding schemas and ideas properly to each other but once everyone gets a taste of each other’s coding styles, it can be done with minor hiccups. We also need to decide whether we will stick with the idea of using a Mockito style for our testing or setup a server on campus to continue working with fake data. We have communicated with multiple teams about this idea and think that we should at least try to see if setting up a server is viable with as few hiccups as possible otherwise, we will have to look further into testing. I believe that setting up the server could work out well for every group, but it could cause issues with connecting and internal errors that we wouldn’t be able to figure out properly. It is definitely worth a try as it would be an interesting experience to understand and make it easier to test if we should be able to get fake data.

From the blog CS@Worcester – Student To Scholar by kumarcomputerscience and used with permission of the author. All other rights reserved by the author.

Sprint Retrospective – Round Two

            A reflection
on what I learned from this week’s activities is that when the working mindset
begins it goes quite smoothly. Once everyone settles in and breaks the ice, we
are able to communicate clearly and effectively what our intentions are and how
we are to go about it. When a certain task is finished, other members are notified,
and opinions are needed before we go any further with the task or beginning a
new one. When we get proper feedback, we are able to safely continue down the
path or create a new one to account for changes.

            Another
lesson learned from this week’s activities is that members will tend to focus
on tasks that they are comfortable with first. In my case, since no one was
comfortable picking up the role on working with databases, I felt confident and
comfortable enough to pick up the task. As for the other group members, they
also went off in the direction that would prove most beneficial to the group.
This way, the group will spend less time learning material that other members
are clearly proficient enough to get started. After that, we are able to
converse and teach our knowledge with the rest of the group members which is
quite efficient.

            In light of
this lesson learned, the next time there is a situation where the group is
clearly new to each other, and a project is being newly developed. It should be
safe to assume that everyone is not comfortable with each other yet and needs
time to adjust to the new environment and mindset. In this case, there is no
need to be anxious about the project over the course of several weeks as the
working process will natural come.

            During this
sprint, my task was mainly focused on creating a design for the database. This involved
reviewing materials provided by the client and any requirements or constraints that
are to be noted. The chosen route when creating a database to account for Database
Management System (DBMS), as such an E-R Model is required. The chosen platform
for the database is SQLite, we noted the importance of being able to export the
database file as a CSV file and vice-versa. Being able to obtain a CSV file is
important for the client as it’s their preferred filetype for distributing
information.

            Starting
off, I noted for four entities, staff, client, inventory, and items. In the
staff entity, it contained the attribute OneCard_ID
and a composite attribute Name which
accounted for First, Middle, and Last Name of the staff member. For the
client, it contains all of the attributes of the staff entity but introduces a
third attribute called Last Visit Date,
to account for information regarding the last time the client visited the food
pantry. Then you have the inventory entity which only contains the attribute Total Weight, since the pantry uses weight
to keep track of how much food is in stock. Lastly, the items entity contains
five attributes, Item ID, Item Name, Item
Weight, and Item Stored Date
. However, to account for a concern from the client
about confidentiality of information the names of staff and clients are later
crossed off from the E-R Model. In conclusion, after consulting the group, the
next step is to create and connect the database with the project in order to
fully utilize its intended function.

            Starting off, I noted for four entities, staff, client, inventory, and items. In the staff entity, it contained the attribute OneCard_ID and a composite attribute Name which accounted for First, Middle, and Last Name of the staff member. For the client, it contains all of the attributes of the staff entity but introduces a third attribute called Last Visit Date, to account for information regarding the last time the client visited the food pantry. Then you have the inventory entity which only contains the attribute Total Weight, since the pantry uses weight to keep track of how much food is in stock. Lastly, the items entity contains five attributes, Item ID, Item Name, Item Weight, and Item Stored Date. However, to account for a concern from the client about confidentiality of information the names of staff and clients are later crossed off from the E-R Model. In conclusion, after consulting the group, the next step is to create and connect the database with the project in order to fully utilize its intended function.

            Starting off, I noted for four entities, staff, client, inventory, and items. In the staff entity, it contained the attribute OneCard_ID and a composite attribute Name which accounted for First, Middle, and Last Name of the staff member. For the client, it contains all of the attributes of the staff entity but introduces a third attribute called Last Visit Date, to account for information regarding the last time the client visited the food pantry. Then you have the inventory entity which only contains the attribute Total Weight, since the pantry uses weight to keep track of how much food is in stock. Lastly, the items entity contains five attributes, Item ID, Item Name, Item Weight, and Item Stored Date. However, to account for a concern from the client about confidentiality of information the names of staff and clients are later crossed off from the E-R Model. In conclusion, after consulting the group, the next step is to create and connect the database with the project in order to fully utilize its intended function.

What I produced this sprint:

References:

https://www.geeksforgeeks.org/database-management-system-er-model/

From the blog CS@Worcester – Progression through Computer Science and Beyond… by Johnny To and used with permission of the author. All other rights reserved by the author.

Sprint 2 Retrospective

During the first sprint, our goal was to get everyone set up with the development environment so that we could all build the AMPATH project and get to work as soon as we were given user stories/had tasks. I believe of the time of the last blog post, we still had to finish getting one or two of my teammates set up, but that was resolved rather quickly. After that, it was learning testing in Angular while playing the waiting game for AMPATH’s team to get in touch.

And well, wait we did. That was no fault of AMPATH’s, though. They’re a rather small development team with a big project. They’ve got their work cut out for them and they’re seemingly very busy.

Unfortunately, with how busy they were, we didn’t get any new tasks to work on at all this past sprint. What was nice was that we got plenty of time to familiarize ourselves with angular and testing. Reviewing testing was important because, for the upcoming tasks we got, we’re trying to figure out whether or not we’re going to be using mocking or a real database with random values for our “back-end” data. If we go with mocking as AMPATH has suggested to us, then our time spent learning testing with Angular over this sprint will be put to good use. I’m also pretty thankful for my Software Quality Assurance and Testing course that I took last semester, because that went in depth about a lot of these same topics.

Overall, Sprint 2 was fair uneventful. However I feel as though my team got more accustomed to working with one another and got a bit more comfortable with each other, too. So for those reasons, I think that it was a positive sprint. I’m excited for the next few weeks of Sprint 3 so we can start working on some coding!

From the blog CS@Worcester – James Blash by jwblash and used with permission of the author. All other rights reserved by the author.

Sprint-2

There was very little productivity during this sprint due to minimal work assigned. To keep busy our team used the time to learn about angular and testing in angular. One method that helped me learn more about angular was to do the Tour-of-heroes tutorial on the site. After doing so I understood why angular was used and what components really were and how they responded and “talked” to each other.

The final day of the sprint, we were given assignments that included creating the GUI of some sort of web application. Our team sat down and decide which interface we wish to move forward with. Before doing so we actually looked into what programs we were going to use and watched some YouTube videos on the instructions.

From the blog CS@Worcester – Life in the Field of Computer Science by iharrynguyen and used with permission of the author. All other rights reserved by the author.

The IncreEdibles Sprint 2 Retrospective

This is the Sprint 2 Retrospective for team The IncreEdibles. We got assign to food pantry development, but we didn’t give any specific task. Big part of our team is design program and listen to the food pantry owner. There are two projects that we are working on, one is the make API that support other project where they can pull any information that they want. The other project is to work with Worcester State University food pantry.
As a group we decided to focus on WSU food pantry since we see more potential in this project. First, we want to know what the important features that costumers want. We learned that setup with costumers is not easy, not just to set the time and place for meeting. We have setup our communication on Slack, but most of the costumers are not in tech they don’t want to install complicate software. They want to have program where simple “plug and play”, so their energy can focus on what important to them. This is the problem that I think we always face with customers. We as developers before the meeting need to have set of question to ask, not all customers know what they want. We had meeting with Joanne, the professor who run the program. She wants to know who goes in and how much they take out the food, keeping track with the amount of food (by weight) is the main feature.
We took notes from the meeting and make email as direct communication that convenient for both parties. These features are important, but we must think of the design future features as program getting update. Features that they don’t think they need at this moment, that mean we must track data. These are sensitive data, we must be caution. The features seem not difficult as keep up with the weight of the food, but we want to have reliable program where it’s simple and easy to prepare/add feature.
There are few techs that our group need to know, OneCard swipe machine, we need to know that it is operative and how to implement to our program. How to export from the “sign up” Google Form. Export form that the costumer can export to submit to Worcester Food pantry. And most important is design our program where it is simple, clean and it do what it’s supposed to do.
Our next step is researching all the techs to make all priority feature work. Make a mock program, and present/sell it to the costumers. In this sprint we want to know how far we can get this program to work. There is other group in different section also look at this program, our problem is time difference and communication. If they have the same direction as us, we should find a way to divide the program into two parts that two group could work on. We find that the communication is one of the biggest problems even with members in the same group.

From the blog CS@Worcester – Nhat's Blog by Nhat Truong Le and used with permission of the author. All other rights reserved by the author.

Sprint 2 Retrospective

For this past sprint we didn’t really accomplish all the much since we had no work provided to us. One of the biggest accomplishments was getting the ngl serve and ampath login working for myself. Kyle was running into the same issue I was having and the problem was easily fixed thanks to him. All I had to was go down a version or two to npm version 8.12 somehow that worked while other fixes did not. After this we reviewed some angular and had a week of review essentially. Then yesterday we were given new tasks to complete from the project lead himself. Now we have a direction of what to do for this sprint given to us through several YouTube videos made by the project lead. Each video contains specific details on what we must accomplish/what is needed to essentially full the order. So in summary not much actually happened since the last sprint due to not having any new work given. Looking forward to working on this project in the coming weeks with my team where we will hopefully tackle each problem/objective well as we did for the initial problems.

From the blog CS@Worcester – Matt's Blog by mattyd99 and used with permission of the author. All other rights reserved by the author.

Software Development Capstone – Sprint 2 Retrospective

This past sprint was, to me, significantly less eventful than the first, but still very important in the progress of our capstone project. Over the past couple of weeks, I spent a lot of time focusing more on preparing for this upcoming Sprint 3, familiarizing myself with the tools and technologies that we will be using for our AMPATH project. We just received word about the kind of specific development work that we will be doing for the project, so keep an eye out for my Sprint 3 Retrospective for more information on that!

As I mentioned, Sprint 2 ended up being less productive for me, for a few reasons. We had a couple of class sessions cancelled (snow and other outside circumstances). While this fortunately did not slow our progress (everyone on our team has the AMPATH project built and running successfully!), our team has been taking advantage of each period of class time to discuss our progress, help each other out with any issues what we may be having, and planning our next courses of action. So, missing a couple of the sessions definitely slowed down some of the work that I could’ve been doing.

Another reason why this sprint has been a bit quiet is that we have not heard much about development ideas from the AMPATH team until yesterday, the final day of Sprint 2 and the beginning of Sprint 3. I’m very excited to start coding more, now that we have more of a plan, which involves mobile app development!

Our team had 2 tasks to complete this sprint – reading about Angular testing, and building and running the AMPATH project. Because I completed the second task during the previous sprint, I only had to concern myself with Angular unit testing, along with working together with my teammates to make sure that everyone could run the AMPATH project.

At the beginning of the first sprint, we had been tasked to learn about Karma and Protractor, two popular Angular unit testing tools. I, like other classmates working on development for the AMPATH project, utilized documentation for each tool in order to better understand how they work. My resource to understand Karma is found here, and for Protractor I used this source. Angular automatically incorporates Karma testing when creating any new project, so I spent more time reading about that tool. Karma and Protractor are similar, though, in that both load up servers on one or more browsers (specified when configuring) and runs the developed source code with the written tests. Then, the developer is notified whether each test passes or fails, via command line or through the browser.

This sprint really made me appreciate the quality assurance testing course that I took last semester. Learning about Java unit testing and its basic framework made the comprehension of this newer concept a bit easier.

Once again, I’m looking forward to posting more about progress that our team makes during this upcoming sprint! We have a lot of exciting ideas to discuss and potentially work with.

Thanks for reading!

From the blog CS@Worcester – Hi, I'm Kat. by Kat Law and used with permission of the author. All other rights reserved by the author.

Sprint 2 Retrospective

For this week, I have finished up Sprint 2 and I would glad to be talking about it.

What I wish I could done throughout this sprint was to finding

 

 

 

 

 

 

Links:

From the blog CS@Worcester – Onwards to becoming an expert developer by dtran365 and used with permission of the author. All other rights reserved by the author.

Sprint Retrospective Blog Posts 2

Welcome back everyone to another CS 448 blog post. Today topic is going to be about the second sprint retrospective. This second blog post is going to about the recent actions that I been learning in the class, the work and work products that I am producing during the second sprint. The second sprint was very informative we worked on researching many topics that can potentially relate to our projected plan like Angular testing, Ampath, etc. During this sprint, I already had the Ampath to run on the personal computer but there were a few group members that were having minor issues when building the Ampath project, so I prioritize some so my time towards having Ampath running on every member in the group personal computer. I research many of Unit testing for Angulars like Karma and Protractor and found it important to learn for a solid foundation when testing in Angular. There was really much work again during this sprint as we were waiting for more information about objective for the Ampath project but meeting on this sprint we finally got some clarity in the project. We added more task in our sprint backlog like figuring if we will get access to Ampath on our computers, keeping an eye out for Zeplin shared folder and finding out more about mocking the database. There were also some videos from Gregory Schmidt that we had to watch which I finish which gives the main idea on which we should create during this semester. I found these videos easy to understand and after I feel more anxious and clearer on what must be done. I saw that Gregory Schmidt was developing an android application and now curious if we can create the Ampath application in another platform like IOS. My thoughts on the project are that the project will be a simple application that records and stores data. I will be continuing to do more research on this project during the break and found out more about the developing environment and programming language that we will be using. I researched briefly on how to save data into a database and I found that in IOS developing you can use SQL to create a database and then import the database into the swift project. I believe that you can probably apply the same concept with another other environment and programming language. Other than this information, I really haven’t done any significant towards the Ampath project. Also, if anyone is still having trouble getting the Ampath project to run on their personal computer just follow the lists of steps that I and the members of my group posted on slack. During the sprint, our group work well and perform great together as a team. I learned a lot of important information about testing and application development during this step. I am planning on applying some the stuff that learning in application developing in Swift towards the Ampath project. All in all, this is what happen and the things I learned during this sprint.

From the blog CS@Worcester – Phan's CS by phancs and used with permission of the author. All other rights reserved by the author.

Practice, Practice, Practice

On our journey to become master craftsmen, we must always remember to revisit the fundamentals. Sometimes, the hours spent learning and becoming better at a new job leaves us little time to revisit the fundamentals. Without the room to make and learn from our mistakes, we risk, as best, stagnating and at worst, reinforcing new, … Continue reading Practice, Practice, Practice →

From the blog cs-wsu – Kristi Pina's Blog by kpina23 and used with permission of the author. All other rights reserved by the author.